 |
|
Main Contractor:
Microbiological laboratory, Baxters of Speyside, Fochabers.
Steel frame, block building. Duration 6 months. Approx value £250k
New office, pump and water handling building, Buckie for Morrisons. Approx value £180k
New Build of Nursing Home, Huntly for Deveron Homes. Approx value £140k |
Distillery projects for:
Allied Distillers Ltd
Upgrade and maintenance works at various distilleries.
New forklift ramps and walkways to warehouses at Toremore Distillery, Ballindaloch.
Drainage and concrete hardstandings at Glentauchers and Glendroncach Distilleries.
John Dewar and Sons
New Washback, Pot Ale and Spent Lees at Royal Brackla
New fish ladder at Cawder burn, including stabalisation of river banks. |
Examples of private dwellings - full build contracts:
New 2 Storey House and sewar diversion, West End Area of Elgin
New 1 3/4 Storey House and Services, Kinloss
Betty's Hoose at Achindoun, Dufftown
3 Bed 1 1/2 Storey, Fogwatt - 12 week duration
3 Bed Detached House, Deanshaugh, Elgin
3 Bed Detached Bungalow, Dougella, Orton
These range from entrance porches to multi room extensions Prices range from £5k to £100k.
Works completed utilising various construction methods include traditional, timber kit, steel frame and materials from brick, block, local and imported renders, wet dash, traditional and moray stone, coloured precast, timber cladding etc all sourced locally (where possible) and fitted by experienced local tradesman.
House Extensions:
In carrying out between twenty and thirty per year, we are experienced in coordinating all trades associated with house extensions to suit the client, planning and warrant requirements.
These range from entrance porches to multi room extensions Prices range from £5k to £100k.
Works completed utilising various construction methods include traditional, timber kit, steel frame and materials from brick, block, local and imported renders, wet dash, traditional and moray stone, coloured precast, timber cladding etc all sourced locally (where possible) and fitted by experienced local tradesman.
Insurance Works:
Various works associated with flood damage, including survey reports, strip out, concrete floors etc at locations in and around Elgin area.
Wall repairs
Alteration / Improvement Works:
Our experience allows us to undertake improvement works within traditional dwellings that include works such as relining of chimneys, installing solid fuel stoves, opening up and upgrade of existing fireplaces to meet regulations.
Building repairs including refacing and renew stone dressings utilising traditional stone and masonry mortars.
Stripping off existing external renders, pointing and renew.Strip and point of existing stone walls at Dyke Cemetery, approx 160m2.
Underpinning works:
Dwelling at Smith Street, New Elgin following unexpected subsidence in driveway. Underpin and stabalise as per engineers instructions on various contracts including Moray Seafoods Factory, Buckie
Fireplace:
Construction of new chimney and fireplace at Rothes comprising approx 4 Tonne Moray Stone and 1/2 Tonne of slate for hearths and mantels. |